I should have bought a saws-all much earlier. It took me an hour to finish what is been working on for the last two weeks. The entire side has it’s sheathing removed and I’m ready to replace the base plate.
On Saturday and Sunday, we hauled three loads to the dump: two of just yard waste and one from the shop, so I have room to work again. Last night, I got the rotten base plate cut out and started wrapping vapor barrier between the studs so I can use the un-faced fiberglass battens that I have. The goal is to have both sides insulated. I’m not quite ready to insulate the front, because it’s covered in tongue and groove.